Computer Integrated Systems Design

Our services

Six disciplines

JACEYYY NAILED IT LLC plans the wiring, networks and control layouts that let a building run itself. Each service below can stand alone as a focused engagement, and together they carry a project from the first measurement to years of steady operation. We work from 8857 S 1300 E, Sandy - 84094-1956, United States (US), and we bring the same drafting bench discipline to every site.


Control Systems Integration

Integration is the work of making separate pieces of building equipment behave like one team. A packaged rooftop unit, a variable air volume box, a lighting panel, a card reader and a domestic water booster all arrive with their own controllers and their own ideas about how the world works. We design the strategy that connects them: point schedules that name every input and output, communication protocol selections that let the controllers speak, and sequence of operations narratives that describe what should happen at 7 in the morning and again at midnight. The design also covers failure modes, so a lost network connection produces a safe state rather than a frozen building. By the time the panels are mounted, the integrator has a map, the electrician has a schedule and the owner has a system with predictable behavior.

Structured Network Layout

A building network is the nervous system of everything else, so we lay it out with the same care as a load-bearing wall. Our drawings specify horizontal cabling runs, backbone risers between floors, telecommunications room locations, rack elevations, patch panel positions and wireless access point placement. We size conduit for future growth, respect bend radius and fill limits, and keep communications cable separated from power where interference would cost signal quality. Every outlet gets a label, every run gets a length, and every room gets a pathway that the installer can follow without interpretation. The result is a network that supports the control traffic of today and still has room for the devices the owner has not bought yet.

Sensor and Equipment Planning

Sensors are where a building meets the physical world, and a sensor in the wrong place reports the wrong truth. We plan occupancy detectors around actual sight lines, temperature and humidity elements away from supply diffusers and direct sun, carbon dioxide monitors in the breathing zone, and flow meters on the pipes where the readings mean something. Each device is selected for its range, accuracy and maintenance burden, and each placement is drawn with a mounting height and an orientation. We also document the expected value each point should report under normal conditions, which gives commissioning a reference to test against instead of a guess. Planning sensors properly is the cheapest reliability a building can buy.

Systems Documentation

Documentation is the deliverable that outlives the installation crew. We produce riser diagrams, panel and device schedules, network addressing tables, sequence of operations narratives and as-built markups that reflect what was actually installed. The set is written in plain language with a consistent naming convention, so a facility manager can find a point number without decoding abbreviations. We keep a master index so revisions are tracked and superseded sheets are retired, and we hand the owner a package in both printed and digital form. When a future tenant fit-out or equipment replacement arrives, the documentation answers most of the questions before anyone climbs a ladder.

Commissioning Walkthroughs

Commissioning is where the design proves itself. We walk the building zone by zone and test each point against the documented intent: sensors against reference instruments, dampers and valves through their full travel, schedules and overrides through a complete day, and graphics against the equipment they represent. Findings are recorded with a clear description, a location and the trade responsible, so the punch process has a spine. We re-test corrected items rather than accepting a verbal confirmation, and we leave the owner with a signed record of what was verified. A typical zone takes about forty-five minutes on site, and a full building is scheduled in stages so operations continue while we work.

Ongoing Systems Support

The building keeps changing after the certificate is signed, and the layout should change with it. Our support service covers point additions for tenant improvements, controller replacements as equipment ages, network expansions when a new wing comes online, and documentation updates so the record stays honest. Support can be a scheduled quarterly review that catches drift before it becomes a complaint, or a single phone call when a contractor needs the current riser diagram. Because we designed the original layout, the answer comes with context, and the fix respects the logic the building was built on rather than patching over it.

How a project runs

The process below is the same for a single control panel or a whole facility. It keeps the design honest and the field informed.

  1. Walkthrough and measurement

    We visit the site, measure the rooms, photograph existing equipment and talk with the people who run the building every day. This is where the real requirements surface.

  2. Layout and marking

    Back at the bench we lay out devices, pathways and panels, marking each decision on the plan until the drawing can be read without a narrative.

  3. Documentation package

    We issue the schedules, risers, addressing tables and sequences that the trades and the owner will use as the single source of truth.

  4. Construction support

    We stay reachable while the work is installed, answering field questions quickly and revising drawings when conditions on site demand it.

  5. Commissioning and handover

    We test every point, close the punch list with evidence, and hand the owner a verified record and a current documentation set.

Ready to lay out your building systems

Tell us about the building and what is not working, and we will bring the square, the story pole and the chalk line to your site. A systems walkthrough takes about forty-five minutes, and the marked drawings follow within the week. Reach out through our contact page or write to appointments@jaceyyynailedit.surf, and we will find a time that fits your operation.

Book a systems walkthrough →